TA naning pts

De
Version datée du 6 février 2026 à 18:12 par Jtremblet (discussion | contributions) (Page créée avec « =Naming points= In order for software to recognize points during imports, a point naming convention must be adopted. *FTO : Field Take Off for airfield departure *SP : Starting Point for the first gate *TPx : Turning Point for the next points *SCx : Secret point for the secret point on leg *iFP : Intermediate Finish Point, if touch & Go is mandatory *iSP : Intermediate Starting Point, if touch & Go is mandatory *Px : Picture on route *Tx : Canevas on route »)
(diff) ← Version précédente | Voir la version actuelle (diff) | Version suivante → (diff)
Aller à la navigation Aller à la recherche

Naming points

In order for software to recognize points during imports, a point naming convention must be adopted.

  • FTO : Field Take Off for airfield departure
  • SP : Starting Point for the first gate
  • TPx : Turning Point for the next points
  • SCx : Secret point for the secret point on leg
  • iFP : Intermediate Finish Point, if touch & Go is mandatory
  • iSP : Intermediate Starting Point, if touch & Go is mandatory
  • Px : Picture on route
  • Tx : Canevas on route